Read this first: The figures come from 190 City of Chicago renovation/alteration permits issued 2025-10-16 to 2026-10-14, picked because the work description mentions a kitchen or bath and residential use. Reported cost is what the applicant wrote on the permit, which may not be what the job cost. These permits lean toward large or structural jobs: many small kitchen and bath updates use express permits or need none, so they are under-represented. Treat the numbers as context, not a quote.

Labor and install only. These are labor and install prices only. Finish materials the homeowner bought (cabinets, countertops, tile, fixtures, flooring, appliances) are not included, and they often add as much as or more than the labor.

Real projects (contractor-sold prices from one Chicago-area GC, 2025-2026): 7 kitchen jobs, final sold price median $23,000, range $18,500–$49,000. These are labor/install prices sold to homeowners (including the GC's overhead and profit), not subcontractor costs, from mostly north-suburban jobs. See every project.

By trade (n=7 kitchen jobs)

For each trade: the median and min–max of what was sold, counting only jobs that had that trade (change orders included, rounded to $100). Cabinets, countertops and appliances were usually bought by the homeowner or a vendor, so they're mostly missing. These are labor/installation trades from the GC's contract.

Labor and install only. These are labor and install prices only. Finish materials the homeowner bought (cabinets, countertops, tile, fixtures, flooring, appliances) are not included, and they often add as much as or more than the labor.

Trades such as flooring and tile are the install labor only; the material was bought separately by the client.

TradeJobs with this tradeMedianRange (min–max)
electrical6 of 7$6,200$3,100–$7,500
flooring6 of 7$4,900$600–$12,000
plumbing6 of 7$3,800$2,300–$6,800
demolition5 of 7$3,400$600–$6,500
carpentry5 of 7$2,700$800–$12,000
hvac mechanical5 of 7$1,500$800–$3,500
drywall4 of 7$4,500$2,500–$5,000
tile4 of 7$3,200$800–$4,200
painting4 of 7$2,500$1,500–$4,500
other4 of 7$1,300$200–$1,800
windows doors1 of 7$2,500$2,500–$2,500
wallpaper1 of 7$1,800$1,800–$1,800
appliance install1 of 7$800$800–$800
exterior1 of 7$200$200–$200

On KB-06, KB-07, KB-08, line items add up to $900–$1,750 more than the final total because of options and credits, so trade amounts there may run slightly high. Totals elsewhere on the site use the final contract amount.

Excluded: kitchen + bath and bath jobs (different scope mix). See each project.